Package of Construction of tide control dam at Cau Duc Nho creek, Thu Duc District, Ho Chi Minh City was implemented and completed in November 2012 by UDC.
Package BT3/B/10/ICB – Civil Works for Sewerage and Interceptor Systems and O&M Equipment for Phan Thiet City - Central Region Small and Medium Towns Development Project - Binh Thuan Subproject
Package PY2A/B/10/ICB - Civil Works and O&M Equipment for Drainage System in Tuy Hoa City, Phu Yen Province - Central Region Small and Medium Towns Development Project - Phu Yen Subproject.
The package implementation was started by UDC in September 2010. The pipeline was installed under Saigon river bed, which connected the collection manhole in Binh Thanh District to the wastewater treatment plant to be built in District 2 in the future
Construction and installation package - Temporary relocation of arch sewers within construction site of City Opera House Station, Urban Railway Line of Ho Chi Minh City, Ben Thanh - Suoi Tien Section